© 2008 Donncha O Caoimh no-through-road

No Through Road

Construction work on the building site between Emmett Place and Patrick Street in Cork continues at a pace. Despite the slow down in the economy high rise cranes can still be seen on the city skyline and are more prominent than the recently opened Elysian.

2 Comments

  1. Will Knott
    Posted September 28, 2008 at 1:58 am | #

    I know I’ve asked before, but what filters / post processing did you user here?

  2. Posted September 28, 2008 at 6:11 am | #

    I think I desaturated the image slightly and added the vignette with the circular selection tool, feathered by about 1000 pixels on the original 5MP image, inverted and filled with black. Sharpened after resizing. Thanks for asking :)

    Shot was taken with the Panasonic FZ5 compact camera when I didn’t have a working DSLR.

Post a Comment

Your email is never published nor shared. Required fields are marked *

*
*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

In Photos dot Org is Stephen Fry proof thanks to caching by WP Super Cache